______________________________________________________________________________________
Papers Published in Scientific Journals (if you need a .pdf file of the
papers, please send me an email)
1. Melega, G. M., Araujo, S. A. de., Jans, R. (https://doi.org/10.1016/j.ejor.2018.01.002)
2.
Vanzela, M., Melega, G. M., Rangel, S., Araujo,
S. A. de. (http://dx.doi.org/10.1016/j.cor.2016.10.015)
The
integrated lot sizing and cutting stock problem with saw cycle constraints
applied to furniture production. Computers & Operations Research, 79, 148-160, 2017.
3. Fiorotto, D. J., Jans, R., Araujo, S.A. de .
An analysis of formulations for the
capacitated lot sizing problem with setup crossover. Computers &
Industrial Engineering, 106, 338-350, 2017.
4. Constantino, A. A., Calvi, Mendonça, C. F. X ; Araujo,
S. A. de, Landa-Silva, D. ; Santos, A. F.
Solving a large
real-world bus driver scheduling problem with a
multi-assignment based heuristic
algorithm. Journal of Universal Computer Science, 23, 479-504, 2017.
5.
Poldi, K. C., Araujo, S. A. de. (http://dx.doi.org/10.1007/s10479-015-2103-2)
Mathematical models and a heuristic method for the multiperiod one-dimensional cutting stock problem. Annals of Operation Research, 238, 497-520, 2016.
6.
Molina, F.., Morabito, R., Araujo, S.
A. de. (http://dx.doi.org/10.1057/jors.2016.12)
MIP models for
production lot-sizing problems with distribution costs and cargo arrangement.
Journal of the Operational Research Society, 67(11), 1395-1407, 2016.
7. Rocha, R. F.
; Araujo, S.A. de ; Rangel, M. S. N. Um estudo computacional sobre a
geração de padrões de corte 2-estágios em uma fábrica de móveis de pequeno
porte. Pesquisa Operacional para o Desenvolvimento, 8, 181-213, 2016.
8.
Melega, G. M. ; Araujo,
S.A. de ; Jans, R. (http://dx.doi.org/10.1590/0101-7438.2016.036.01.0167)
Comparison of MIP Models for the Integrated Lot-Sizing and
One-Dimensional Cutting Stock Problem. Pesquisa Operacional, 36(1), 167-196, 2016.
9.
Constantino, A. A., Castro, E. C., Araujo, S. A. de, Mendonça Neto, C. F.
X.(http://dx.doi.org/10.5335/rbca.v8i2.5131)
Pré-Processamento do
Problema de Cobertura de Conjunto Aplicado ao Escalonamento de Condutores.
Revista Brasileira de Computação Aplicada, 8(2), 28-43, 2016.
10. Poltroniere, S. C., Araujo, S. A. de, Poldi, K. C.
Optimization of an Integrated Lot Sizing
and Cutting Stock Problem in the Paper Industry. TEMA-Tendências em Matemática Aplicada e Computaciona,
17(3), 2016.
11.
Vassoler, A. H. D., Poltroniere, S. C., Araujo, S. A. de. (http://www.fc.unesp.br/Home/Departamentos/Matematica/revistacqd2228/v07a06-modelagem-matematica-para.pdf).
Modelagem matemática para o problema de produção de vigotas na indústria de
lajes treliçadas. C.Q.D. Revista Eletrônica Paulista
de Matemática, 7, 68-77, 2016.
12.
Longhi, A. L., Melega, G. M., de Araujo, S. A. Modelos matemáticos para o problema integrado de
dimensionamento de lotes e corte de estoque unidimensional. Pesquisa
Operacional para o Desenvolvimento, 7, 82-104, 2015.
13. de Araujo, S. A., de Reyck, B., Degraeve, Z., Fragkos, I., Jans, R. Period Decompositions for the Capacitated Lot
Sizing Problem with Setup Times. INFORMS Journal on
Computing, 27, 431-448, 2015.
14.
Fiorotto, D. J., de Araujo, S. A. de e Jans, R. (http://dx.doi.org/10.1016/j.cor.2015.04.015)
Hybrid
Methods for Lot Sizing on Parallel Machines. Computers & Operations
Research, 63, 136-148, 2015.
15.
de Araujo, S. A., Poldi,
K. C., Smith, J.
A genetic
algorithm for the one-dimensional cutting stock problem with setups. Pesquisa Operacional
(Impresso), 34 (2), 165-187, 2014.
16. Salles-Neto,
L. L, Golfeto, R.,, Araujo,
S. A. de.
Um
Problema de Corte de Estoque Multiobjetivo. Pesquisa
Operacional para o Desenvolvimento, 6 (2), 183-201,
2014.
17.
Fiorotto, D. J., de Araujo, S. A. (http://dx.doi.org/10.1007/s10479-014-1570-1)
Reformulation
and a Lagrangian Heuristic for Lot Sizing Problem on
Parallel Machines. Annals of Operations Research, 217, 213-231, 2014.
18.
Molina, F., Morabito, R., Araujo, S. A. de, (http://dx.doi.org/10.1590/S0104-530X2013000300006)
Modelos
para Problemas de Dimensionamento de Lotes com Restrições de Capacidade e Custos
de Transportes-Aplicação de uma Heurística Lagrangiana.
Gestão & Produção, 20 (3) 573-586. 2013
19.
Araujo, S. A., Clark A. R. (http://dx.doi.org/10.1016/j.cie.2013.04.003)
A
priori reformulations for joint rolling-horizon scheduling of materials
processing and lot-sizing problem.
Computers & Industrial Engineering, 65 (4) 577-585, 2013.
20. Melega, G. M., Fiorotto, D. J., Araujo. S. A. de
Formulações
Fortes para o Problema de Dimensionamento de Lotes com Várias Plantas. TEMA.
Tendências em Matemática Aplicada e Computacional, 14, 1-14, 2013.
21. Fiorotto, D. J. ; Araujo, S. A. de .
(doi: 10.5540/tema.2012.013.01.0013)
Relaxação Lagrangiana Aplicada ao Problema de Dimensionamento de
Lotes em Máquinas Paralelas: Limitantes Inferiores. TEMA-Tendências em
Matemática Aplicada e Computacional. 13 (1) 13-24. 2012
22.
Santos, S. M., Araujo, S. A. de, Rangel, M. S. N.
Integrated
Cutting Machine Programming
and Lot Sizing in the Furniture Industry. Pesquisa Operacional para o Desenvolvimento, 3 (1),
249-266, 2011.
23. Constantino, A.
A., Santos, A. A., Araujo, S. A. de
A new
genetic algorithm for the covering problem. Varia Scientia v.10, n.17, p. 147-162, 2011.
24.
Araujo, S. A. de; Constantino, A. A. ; PoldI, K. C. (DOI: 10.1111/j.1475-3995.2009.00760.x)
An evolutionary algorithm for the one-dimensional cutting stock
problem. International Transactions in Operational Research, 18, p.
115-127. 2010.
25.
Bernardes, E. D. ; Araujo, S. A. de; Rangel, M. S. N. (http://dx.doi.org/10.1590/S0101-74382010000300008)
Reformulação para um
Problema Integrado de Dimensionamento e Seqüenciamento
de Lotes, Pesquisa Operacional, 30 (3), 637-655, 2010.
26. Molina,
F., Santos, M. O., Toledo, F. M. B., Araujo, S. A. de
(http://dx.doi.org/10.1590/S0101-74382009000200002)
An
Approach Using the Lagrangian/Surrogate Relaxation
for Lot-Sizing and Distribution Problem. Pesquisa Operacional, v. 29, p. 269-288, 2009.
27.
Araujo, S. A. de, Arenales, M. N., Clark, A. R. (http://dx.doi.org/10.1016/j.cor.2006.05.010)
Lot-Sizing and Furnace Scheduling in Small Foundries.
Computers and Operations Research. , v.35, p.916 - 932, 2008.
28.
Araujo, S. A. de, Arenales, M. N., Clark, A. R. (DOI
10.1007/s10732-007-9011-9)
Joint
Rolling-Horizon Scheduling of Materials Processing and Lot-Sizing with
Sequence-Dependent Setups. Journal
of Heuristics. , v.13, p.337 - 358, 2007.
29. Sousa Netto, C.
A. de, Constantino, A. A., Araujo, S. A. de
Ferramenta de Apoio
ao Escalonamento de Teleatendentes. Espaço Energia,
05, 11-21, 2006.
30. Araujo,
S. A. de, Arenales, M. N.
Planejamento
e Programação da Produção numa Fundição Cativa de Grande Porte. Investigação
Operacional. , v 24, p.197 - 210, 2004.
31.
Araujo, S. A. de, Arenales, M. N., Clark, A. R. (http://dx.doi.org/10.1590/S0104-530X2004000200003)
Dimensionamento de Lotes
e Programação do Forno numa Fundição de Pequeno Porte. Gestão & Produção. ,
v.11, p.165 - 176, 2004.
32. Araujo, S. A.
de, Arenales, M. N.( http://dx.doi.org/10.1590/S0101-74382003000300002)
Dimensionamento de
Lotes e Programação do Forno numa Fundição Automatizada de Porte Médio.
Pesquisa Operacional. , v.23, p.403 - 420, 2003.
33. Araujo, S. A.
de, Arenales, M. N. (http://dx.doi.org/10.1590/S0101-74382000000200010)
Problema de
Dimensionamento de Lotes Monoestágio com Restrição de
capacidade: modelagem, método de resolução e resultados computacionais.
Pesquisa Operacional. , v.20, p.287 - 306, 2000.